Quality Acceptance of Railway Track Engineer on Ballastless Track System

Yun-Hua ZHU

Abstract


The Supervision Management team and Organization, in accordance with the regulations, rules, codes and standards issued by the MOR, in order to improve the supervision level and standardize the supervisory practice in ballastless system construction shall: Establish the leading group; Clarify the responsibility; Establish Document Management system; Train and Tests of personnel.This document clarifies all these aspects according to the client requirement for the Ballastless track system construction process. The Supervision organization shall check technical control system and quality management system of the contractor that mainly included: Organization Structure of technical management and quality management System; Technical and quality management system; Full time quality management personnel and their presence on site; and Train, Tests, Qualification certificate and Work License of special staff.

Keywords


quality control; supervision organization; contract management; construction safety


DOI
10.12783/dtssehs/mess2017/12080

Full Text:

PDF